Haier Europe completes installation of the 3.3 MW solar panel system at the Jinling factory in China
We are committed to achieving at least 60% renewable energy at all our manufacturing sites by 2025. In 2022-2023, we have already reduced our operational emissions by over 20% through the implementation of a range of energy efficiency solutions at our manufacturing sites.
We’re delighted to have reached another milestone towards this goal: the installation of a 3.3 MW solar panel at the Jingling plant, which is able to produce 3.6 million kWh per year, covering 15% of the plant’s energy consumption.